| 
Railhub Archive 2001-02-28 ANG-001 Anglia Railways0
Changes to Anglia Railways’ London Crosslink services
keywords: click to search
 accidents
 Great Heck
 London Crossrail
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
       Changes to Anglia Railways’ London Crosslink services _______________________________________________________________

 related documents
type Press release
Some timetable changes to Anglia Railways’ current scheduled London Crosslink service between Stratford and Basingstoke will be introduced from Thursday 1 March.
This will result in the temporary cancellation of some London Crosslink services, in order to provide additional trains to Anglia Railways’ sister company, Hull Trains following today’s tragic rail accident near Doncaster.
This is to enable Hull Trains to double the seating capacity on all their services between Hull, Doncaster and London to provide additional seats on East Coast Main Line services. This is part of an industry-wide response - agreed with the Strategic Rail Authority - to today’s accident, while GNER services are operating to a revised timetable, and will apply from Thursday 1 March until at least Monday 5 March.
As a result, the following London Crosslink services will not run until further notice:
08.04 and 14.04 services from Stratford to Basingstoke
10.32 and 16.32 services from Basingstoke to Stratford
Passengers should travel via London and / or services operated by Silverlink and South West Trains.
Railhub Archive ::: 2001-02-28 ANG-001
 | | 

Saturday 6















  2 stories

  3 documents

  4 collections

| |