| 
Railhub Archive 2012-07-20 DfT-002 Department for Transport0
High speed rail: Investing in Britain’s future consultation summary report addendum
keywords: click to search
 High Speed 2
 high speed rail
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
         High speed rail: Investing in Britain’s future consultation summary report addendum _______________________________________________________________
 type Report
note A report to Government by Dialogue by Design
On 10 January 2012 the Government announced its decision to develop a new national high speed rail network following the completion of a major public consultation. On 29 May, the consultation responses were published online. We then discovered that a small number of responses (407 out of 55,322 responses) had unintentionally not been forwarded to Dialogue by Design for inclusion in their response assessment process. In addition, a further 6 responses had been incorrectly marked as duplicates by Dialogue by Design. This addendum report is a supplementary analysis of all the affected consultation responses which was commissioned from Dialogue by Design. The report concludes that these 413 responses do not provide any information that was not already included in the previous Consultation Summary Report or would have made a difference to the substantive content or balance of that report”. Therefore, their inclusion in Dialogue by Design’s original review of responses would not have substantially changed its findings nor affected the considerations which informed the decisions following consultation. The Secretary of State for Transport issued a statement to Parliament about this on 17 July 2012 and we have contacted all those who submitted a response affected by the processing error. The consultation summary report and the addendum report each include a list of participating organisations at appendix 2 and appendix 1 respectively. Individual respondents are not listed. Download documents High speed rail, Investing in Britain’s future consultation summary report addendum (PDF – 565 KB) [[see link]] High Speed 2: Phase 1 Consultation Update, written ministerial statement by Secretary of State for Transport, 17 July 2012 [[see link]]
Railhub Archive ::: 2012-07-20 DfT-002
 | | 

Tuesday 23















  202 stories

  3 documents

  1 collection


 
  2 documents

  1 document

| |