| 
Railhub Archive 2019-02-26 HOC-001 House of Commons0
Midland main railway line: electrification
keywords: click to search
 electrification
 Midland Main Line
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
       Midland main railway line: electrification _______________________________________________________________

 related documents
type Written answer note HC Deb, 26 February 2019, cW Written question 222764
Neil O'Brien Conservative, Harborough:
To ask the Secretary of State for Transport, if he will extend the electrification of the Midland Main line to Market Harborough.
Andrew Jones Parliamentary Under-Secretary (Department for Transport), Vice-Chair, Conservative Party:
Network Rail has been instructed to design an extension of electrification infrastructure from Kettering to Market Harborough station, as part of the Midland Main Line enhancements programme.
The Overhead Line Equipment (OLE) extension to Market Harborough will enable a new connection to a power supply at Braybrooke. At Outline Business Case stage in March 2018 this was determined to be the best value for money option for making the power supply connection. In line with normal practice, this will be tested again when the overall Midland Main Line programme Key Output 1a, of which Market Harborough electrification is a constituent part, is assessed at Full Business Case stage.
Railhub Archive ::: 2019-02-26 HOC-001
 | | 

Saturday 18















  3 stories

  1 document

  1 collection

| |