| 
Railhub Archive 2019-11-12 CRO-001 Crossrail0
Statement
keywords: click to search
 costs
 Crossrail
 delays
 Elizabeth Line
 
Phrases in [single square brackets] are hyperlinks in the original document
Phrases in [[double square brackets]] are editorial additions or corrections
Phrases in [[[triple square brackets]]] indicate embedded images or graphics in the original document. (These are not usually archived unless they contain significant additional information.) | | 
         Statement _______________________________________________________________

 date 12 November 2019 source Crossrail
type Press release
A spokesperson for Crossrail Ltd said: “Following the opening of the central section between the new Paddington Elizabeth line station and Abbey Wood in 2021, the remaining opening stages will occur which will introduce through services from Shenfield and Reading, known as Stages 4 and 5.
“Twelve trains per hour will operate between Paddington and Abbey Wood when the central section opens, this will increase to 24 trains per hour in the peak between Paddington and Whitechapel at Stage 4. The core tenant of our plan to complete the Elizabeth line is ensuring the highest levels of reliability at Stage 3 before 24 trains per hour are introduced into the central section at Stage 4.”
Railhub Archive ::: 2019-11-12 CRO-001
 | | 


  3 collections


 
  1 document

  1 document

| |